Project snapshot
LiqTech supplied ceramic membrane QlariFlow™ Aquatics filtration technology to its partner Barr+Wray, which integrated the technology into the pool water-treatment design for a landmark £36 million public leisure facility.
Location: Blairgowrie Recreation, Perthshire, Scotland
Client: Perth & Kinross Council
Pool type: New-build Leisure Centre
Project-specific circulation requirement: ≤40 W/m²
Achieved performance: Below 25 W/m²
Pool size: 25 m, six-lane pool
Commissioning: 2025
The challenge
Indoor pools place unusually high demands on energy, water and building services. At Blairgowrie, the filtration plant had to maintain dependable public pool water quality while supporting an ultra-low-energy design. The six-lane pool serves both the community and Blairgowrie High School, so the solution also needed to be robust, automated and suitable for changing operational loads.
For the project team, filtration was therefore an energy design decision, not solely a water quality specification. Pressure loss, circulation demand, cleaning cycles and system control all had to work within the Passivhaus strategy.